Site Final | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation ESC | 2/25/2009 | 2/25/2009 | 2/25/2009 | | CANC |
Clint A Smith
|
|
|
Moved to a General Inspection.
|
Conference | 2/19/2009 | 2/19/2009 | 2/19/2009 | A | DONE |
Eric Strole
|
|
|
Training with Clint Smith on proper procedure to discharge water on a well drill.
|
General Inspection | 2/18/2009 | 2/19/2009 | 2/19/2009 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Need to place a weighted product on top of the wattle along the curb inlet so water does not seep underneith it. Told RP to cntact me prior to discharging occuring.
|
General Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | CANC |
Clint A Smith
|
|
|
Wrong date.
|
Site Preparation | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PART |
Clint A Smith
|
|
|
Went over where there discharging will be going when it is needed. They will discharge at the back side of the berm to the north and direct the outlet of the hose to the north west into the open ara of the park. They will be using plastic and energy disapater at the oultet of the hose to eliminate erosion. Also instructed them to place a sediment barrier along the curb inlet and weight it down to protect from a direct discharge into the inlet. Will re-inspect on 2/19/08 to check on proper bmp's.
|
Issue & PRINT permit COM | | | 2/18/2009 | | DONE |
|
|
|
|
Application received | | | 2/17/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/17/2009 | | 2/17/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2009 | | |
|
|
|
|
Telephone call | | | 2/17/2009 | | DONE |
|
|
|
left message w lynn for sam at ###-#### - permit ready and fees due
|
Permit Ready to Issue | | | 2/17/2009 | | DONE |
|
|
|
|