Site Final | 5/18/2010 | 5/18/2010 | 5/18/2010 | A | PASS |
Clint A Smith
|
|
|
Storm drain inlet protection has been removed.
|
(F) Reprint permit | | | 3/31/2009 | | DONE |
|
|
|
|
Site Preparation | 3/12/2009 | 3/12/2009 | 3/12/2009 | | PASS |
Clint A Smith
|
|
|
Drain is protected. Site looks good.
|
Site Preparation | 3/5/2009 | 3/5/2009 | 3/5/2009 | P | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 3/5/2009 | | DONE |
|
|
|
|
Application received | | | 2/26/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/26/2009 | | 2/26/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|
Telephone call | | | 2/26/2009 | | DONE |
Tisha Gallop
|
|
|
called Jim and told him permit is ready and fee
|
Override - Parcel Holds | | | 2/26/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 2/26/2009 | | DONE |
Tisha Gallop
|
|
|
|