Aging Inspection | 11/25/2010 | 11/25/2010 | 11/26/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 11/26/2010 | 11/26/2010 | 11/26/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 5/15/2009 | 5/15/2009 | 5/15/2009 | P | FAIL |
Jim Sly
|
|
|
Talked to RP.....Complete landscaping....30 days from this notice
|
Tracking Control | 5/11/2009 | 5/11/2009 | 5/11/2009 | A | FAIL |
Jack Frank
|
|
|
called clean hard surfaces R?P said cleanup in progress
|
General Inspection | 4/21/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
Tracking Control | 4/13/2009 | 4/14/2009 | 4/14/2009 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 4/13/2009 | 4/13/2009 | 4/13/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: Clean up all foot tracking off of the hard surfaces infront of the lot by the end of the day. Will re-inspect on 4/14/09 PM.
|
Tracking Control | 4/10/2009 | 4/10/2009 | 4/10/2009 | P | PASS |
Eric Strole
|
|
|
|
Tracking Control | 4/9/2009 | 4/10/2009 | 4/10/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: Discussed with RP that they need to have ALL sediment and debris cleaned up today prior to any rain event. Will be re-inspected in the PM by #380.
|
Conference | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | DONE |
Clint A Smith
|
|
|
Told RP to keep tracking off of the street as much as possible by keeping the equiptmet on the lot.
|
Tracking Control | 4/9/2009 | 4/9/2009 | 4/9/2009 | A | FAIL |
Clint A Smith
|
|
|
Clean up all tracking off of hard surfaces. Will re-inspect on 4/10/09 AM.
|
Site Preparation | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 | P | PART |
Jack Frank
|
|
|
card posted excavation work being done at time of inspection site ok
|
Site Preparation | 4/3/2009 | 4/3/2009 | 4/3/2009 | | PART |
Eric Strole
|
|
|
no activity at this time.
|
Issue & PRINT permit SFD | | | 3/27/2009 | | DONE |
|
|
|
|
Application received | | | 3/5/2009 | | |
|
|
|
|