General Inspection ESC | 8/2/2010 | 8/2/2010 | 8/2/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 8/2/2010 | 8/2/2010 | 8/2/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 7/2/2010 | 7/2/2010 | 7/2/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 6/1/2010 | 6/1/2010 | 6/1/2010 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | FAIL |
Jim Sly
|
|
|
C/N posted on site........Obtain new RP within 24hrs of this notice or Stop Work notice will be posted. 10:00 AM.
|
Random Inspection | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Jim Sly
|
|
|
Appears OK
|
Random Inspection | 6/1/2009 | 6/1/2009 | 6/1/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/14/2009 | 5/14/2009 | 5/14/2009 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/7/2009 | 5/7/2009 | 5/7/2009 | P | PASS |
Mike Jordan
|
|
|
|
Issue & PRINT permit COM | | | 5/7/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/14/2009 | | 4/14/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Random Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | PASS |
Clint A Smith
|
|
|
Permit not established for building but site looks good since demo permit was finaled.
|
Application received | | | 3/13/2009 | | |
|
|
|
|