Random Inspection | 3/19/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Final | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/27/2009 | 3/30/2009 | 3/30/2009 | A | DONE |
Clint A Smith
|
|
|
Spoke with RP over the specifications of reaching a "PASS" of a site final inspection. Told them that he must stabilize all disturbed soil using an approved ground cover and or a sprayed product with a fast growing seed mix.
|
Site Preparation | 3/27/2009 | 3/27/2009 | 3/27/2009 | | FAIL |
Clint A Smith
|
|
|
Vebal message to RP's office(HardRock): Clean up all sediment and debris off of all hard surfaces by the end of the day. Will re-inspect on 3/30/09AM.
|
Issue & PRINT permit SFD | | | 3/20/2009 | | DONE |
|
|
|
|
Application received | | | 3/17/2009 | | |
|
|
|
|