DOC - Permit Finaled | 10/20/2009 | 10/20/2009 | 10/20/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/10/2009 | 7/10/2009 | 7/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 7/7/2009 | 7/7/2009 | 7/7/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/20/2009 | 5/20/2009 | 5/20/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 5/14/2009 | 5/14/2009 | 5/14/2009 | P | PASS |
Jack Frank
|
|
|
ok
|
Site Preparation | 4/20/2009 | 4/20/2009 | 4/20/2009 | A | PASS |
Eric Strole
|
|
|
site looks good, no issues.
|
Issue & PRINT permit COM | | | 4/15/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/13/2009 | | 4/13/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. Needs certified RP prior to issuance of permit.
|
Application received | | | 3/26/2009 | | |
|
|
|
|