Aging Inspection | 3/5/2012 | 3/5/2012 | 3/5/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 3/5/2012 | 3/5/2012 | 3/5/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 1/3/2012 | 1/3/2012 | 1/3/2012 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 10/31/2011 | 10/31/2011 | 10/31/2011 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 8/29/2011 | 8/29/2011 | 8/29/2011 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment off of the sidewalks and maintain the sediment barriers along the back of sidewalk. Will follow up on 6/29/2011AM.
|
Aging Inspection | 4/25/2011 | 4/25/2011 | 4/25/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 2/22/2011 | 2/22/2011 | 2/22/2011 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Daryl Spivey
|
|
|
|
Aging Inspection | 2/16/2011 | 2/16/2011 | 2/17/2011 | | PASS |
Daryl Spivey
|
|
|
|
Random Inspection | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | P | PASS |
Dave Hannah
|
|
|
|
Conference | 6/14/2010 | 6/21/2010 | 6/21/2010 | A | PASS |
Steven Webb
|
|
|
Permit been transfer with new RP???? Met with Shawn, ageeement that prior to re-starting the project that the ESC permit will be transferred along with a certified RP.
|
Random Inspection | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | FAIL |
Steven Webb
|
|
|
No sign posted, left one on site. Called RP but the permit holder is no longer working on this project. After discussion with the parcel owner, T. Barber he informed me that a new contractor has been hired, Shawn Cavertity (sp). Shawn will need to transfer the ESC permit along with a certified RP or a stop work order will have to be issued. Will follow up.
|
Random Inspection | 4/1/2010 | 4/2/2010 | 4/2/2010 | A | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | PART |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 7/27/2009 | 7/27/2009 | 7/27/2009 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 6/26/2009 | 6/29/2009 | 6/29/2009 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 6/26/2009 | 6/26/2009 | 6/26/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1.Clean up all sediment off of the road ways. 2. Containerize of remove pump ram that is located on the site. 3. Maintain exit at the North West end of project area. Will re-inspect on 6/29/09 AM.
|
General Inspection | 6/1/2009 | 6/4/2009 | 6/4/2009 | A | PART |
Clint A Smith
|
|
|
All tracking cleaned up. Told RP to maintain construction entrance.
|
Site Preparation | 6/3/2009 | 6/3/2009 | 6/3/2009 | | CANC |
Clint A Smith
|
|
|
Inspector #420 inspected project today on a complaint.
|
Complaint Inspection | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | FAIL |
Steven Webb
|
|
|
Complaint from ACHD regarding trackout, verbal correction to RP to install better working trackout controls and to have workers park offsite whenever possible.
|
Tracking Control | 6/3/2009 | 6/3/2009 | 6/3/2009 | P | FAIL |
Steven Webb
|
|
|
Needs better controls inside the fence to reduce trackout. Verbal to RP
|
Site Preparation | 6/1/2009 | 6/1/2009 | 6/1/2009 | A | FAIL |
Clint A Smith
|
|
|
Verbal to IRP: Post ESC sign. Make sure to line the washout pit due to the fact of soil type and ground water table. Will re-inspect on 6/4/09AM.
|
Issue & PRINT permit SFD | | | 5/27/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 4/27/2009 | | |
|
|
|
|