Site Final | 5/11/2010 | 5/11/2010 | 5/11/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/11/2010 | 5/11/2010 | 5/11/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is completed.
|
General Inspection | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Needs to sweep gutterpan and driveway.
|
Random Inspection | 2/2/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. BMP's in place. Contractor is sweeping street at end of days work.
|
Random Inspection | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 1/5/2010 | 1/5/2010 | 1/5/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/30/2009 | 12/30/2009 | 12/30/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 12/1/2009 | 12/1/2009 | 12/1/2009 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 11/25/2009 | 11/27/2009 | 11/27/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/25/2009 | 11/25/2009 | 11/25/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along the front of the lot. Will re-inspect on 11/27/09AM.
|
BMP Violation | 11/25/2009 | 11/25/2009 | 11/25/2009 | A | PASS |
Mike Jordan
|
|
|
Al silts have been swept.
|
Random Inspection | 11/24/2009 | 11/24/2009 | 11/24/2009 | P | PART |
Mike Jordan
|
|
|
Needs to sweep all silts from hard surfaces. RP notified verbal c/n.
|
Random Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/19/2009 | 11/19/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/18/2009 | 11/18/2009 | A | CANC |
Mike Jordan
|
|
|
|
Site Preparation | 11/18/2009 | 11/18/2009 | 11/18/2009 | A | CANC |
Mike Jordan
|
|
|
|
Issue & PRINT permit SFD | | | 11/18/2009 | | DONE |
|
|
|
|
Application received | | | 5/19/2009 | | |
|
|
|
|