Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC09-00294
StatusFinaled
Name STEVEN HENDERSON
Site Address 11101 W EXECUTIVE DR
Project Name 
Customer Number 
ePlanReview 
Description
Allied Waste Fueling Facility
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/27/200910/27/200910/27/2009PPASS
DetailsClint A Smith
General Inspection7/29/20097/29/20097/29/2009PPASS
DetailsClint A Smith
General Inspection7/29/20097/29/20097/29/2009APASS
DetailsJack Frank
ok
Site Preparation7/29/20097/29/20097/29/2009APASS
DetailsMike Jordan
DI protection has been installed. Will use plastic swimming pools for washout.
General Inspection7/16/20097/20/20097/20/2009ACANC
DetailsClint A Smith
Completed on a site final.
Site Preparation7/20/20097/20/20097/20/2009 FAIL
DetailsClint A Smith
Verbal to RP:
Protect storm drain to the south west of active area.
Site Preparation7/15/20097/16/20097/16/2009APART
DetailsClint A Smith
Spoke with the new RP:
Showed me the changes of where the utiiy trench will be relocated from the curb to about 25ft to the east. All in all, told him to protect the storm drain inlet and post the ESC sign. Will re-inspect on 7/20/09 AM.
Conference7/13/20097/14/20097/14/2009ADONE
DetailsClint A Smith
WEnt over with Rp that prior to pour date that a concrete washout pit is required with signage posted.
Site Preparation7/14/20097/14/20097/14/2009APART
DetailsTom Arcoraci
post sign
Issue & PRINT permit COM  7/13/2009 DONE
Routing - Erosion and Sediment6/1/2009 6/1/2009 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions.
Application received  5/28/2009