Aging Inspection | 4/19/2011 | 4/19/2011 | 4/19/2011 | | DONE |
Clint A Smith
|
|
|
Permit Finalled.
|
DOC - Permit Finaled | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 2/16/2011 | 2/16/2011 | 2/17/2011 | | PASS |
Jim Johnson
|
|
|
building permit still open
|
Aging Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | | PART |
Jim Johnson
|
|
|
building permit still open
|
Tracking Control | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PART |
Clint A Smith
|
|
|
Still need to put up the ESC sign.
|
Tracking Control | 7/17/2009 | 7/20/2009 | 7/20/2009 | P | FAIL |
Clint A Smith
|
|
|
Discussed with RP over issues today. Will dealt with by the end of the day 7/20/09PM. Will re-inspect on 7/21/09AM.
|
Tracking Control | 7/17/2009 | 7/17/2009 | 7/17/2009 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: Clean up all tracking off of project within the parking lot and onto Jollion ST. Also re post ESC sign at the front of project. Will re-inspect on 7/20/09PM.
|
Random Inspection | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation ESC | 6/17/2009 | 6/17/2009 | 6/17/2009 | | PART |
Clint A Smith
|
|
|
Went over the plan with Mike Hart with C&A Paving. Discussed with hi,m over the alterations to the ESC plan and eliminating certain BMP's where in is not threatening any water convences or protected areas. Told him that all storm drain inlets within the area of impact of the project need to be protected and documented on the ESC plan also by the RP of the project area. Will re-inspect on 6/19/09 PM.
|
Issue & PRINT permit COM | | | 6/10/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/9/2009 | | 6/9/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 6/4/2009 | | 6/4/2009 | | FAIL |
Clint A Smith
|
|
|
ESC plan waiver failed due to the size of disturbance. Contacted Applicant (Tony M. C&A Paving) that plan with a narrative is required.
|
Application received | | | 5/29/2009 | | |
|
|
|
|