Site Final | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Jim Martin phone
|
Site Final | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Jim Martin phone
|
Site Preparation | 7/21/2009 | 7/22/2009 | 7/23/2009 | P | PASS |
Clint A Smith
|
|
|
Due to the project being in the confines of the HP bussiness park. It will not be necessary for the ESC sign being posted.
|
Site Preparation | 7/21/2009 | 7/21/2009 | 7/21/2009 | | CANC |
Clint A Smith
|
|
|
Moved to 7/22/09 at 2PM.
|
Issue & PRINT permit COM | | | 7/14/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/4/2009 | | 6/4/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 6/2/2009 | | |
|
|
|
|