Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC09-00312
StatusFinaled
Name GENE KING
Site Address 4655 S ENTERPRISE ST
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/19/201011/19/201011/19/2010PPASS
DetailsJim Storey
Random Inspection7/14/20107/14/20107/14/2010PPASS
DetailsJim Storey
Random Inspection6/21/20106/21/20106/21/2010PPASS
DetailsJim Storey
Random Inspection6/17/20106/18/20106/18/2010APASS
DetailsJim Storey
Random Inspection6/10/20106/10/20106/10/2010PPASS
DetailsJim Storey
Random Inspection3/12/20103/12/20103/12/2010APASS
DetailsBill VanDegrift
Random Inspection2/12/20102/12/20102/12/2010PPASS
DetailsJim Storey
BMP Violation2/3/20102/10/20102/10/2010PPASS
DetailsClint A Smith
Random Inspection2/9/20102/9/20102/9/2010APASS
DetailsJim Storey
Site Preparation1/28/20102/3/20102/3/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Install silt fence per industry standards. Also post ESC sign where it is visable from the street. Will re-inspect on 2/10/10PM.
Site Preparation1/27/20101/28/20101/28/2010ADONE
DetailsClint A Smith
Went over conditions with contracto/RP. Will re-inspect on 2/3/10 for site prep once bmp's have been implimented.
Site Preparation1/26/20101/27/20101/27/2010ACANC
DetailsClint A Smith
Moved til 28th of 01.
Site Preparation1/26/20101/26/20101/26/2010 NR
DetailsClint A Smith
Will re-inspect with rP on 1/27/10.
Issue & PRINT permit COM  1/19/2010 DONE
Routing - Erosion and Sediment9/21/2009 9/21/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
Routing - Erosion and Sediment9/15/2009 9/15/2009 FAIL
DetailsSteven Webb
ESC submittal still did not include the ESC permit application nor the narrative report. Informed applicant, M. Gier (CSHQA).
Routing - Erosion and Sediment6/15/2009 6/15/2009 FAIL
DetailsSteven Webb
Submittals did not include the required ESC/SWPPP narrative. Plans did include the ESC Blueprint. Informed applicant via e-mail. Airport was notified as well, (Duane Marler).
Application received  6/3/2009