Site Final | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Bill VanDegrift
|
|
|
|
Site Preparation | 7/17/2009 | 7/17/2009 | 7/20/2009 | | PART |
Clint A Smith
|
|
|
Message to RP on 7/17/09: 1. Post ESC sign at the front of the school visable from the street.
|
Issue & PRINT permit COM | | | 7/10/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - Erosion and Sediment | 6/11/2009 | | 6/11/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 6/5/2009 | | |
|
|
|
|