Site Final | 2/17/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Troy James
|
|
|
|
General Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 8/12/2009 | 8/12/2009 | 8/12/2009 | P | PASS |
Doug A Poedy
|
|
|
looks good.
|
General Inspection | 7/17/2009 | 7/17/2009 | 7/17/2009 | P | PASS |
Doug A Poedy
|
|
|
Site looks good.
|
Site Preparation | 6/25/2009 | 6/26/2009 | 6/26/2009 | A | PASS |
Jim Sly
|
|
|
|
Site Preparation | 6/22/2009 | 6/23/2009 | 6/23/2009 | P | PASS |
Clint A Smith
|
|
|
|
48 hr start notification | | | 6/22/2009 | | |
|
|
|
|
Site Preparation | 6/17/2009 | 6/17/2009 | 6/17/2009 | | NR |
Clint A Smith
|
|
|
Site preperation inspect will occur with the footing inspection.
|
Application received | | | 6/10/2009 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 6/10/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|