General Inspection ESC | 5/28/2010 | 5/28/2010 | 5/28/2010 | | DONE |
Clint A Smith
|
|
|
Work completed.
|
DOC - Permit Finaled | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/3/2009 | 9/8/2009 | 9/8/2009 | A | PASS |
Eric Strole
|
|
|
|
Random Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PART |
Eric Strole
|
|
|
left verbal correction with rp to clean up tracking, dirt & debris off all hard surfaces on the williams project & clean up concrete spoil piles on other site.
|
General Inspection | 6/29/2009 | 6/30/2009 | 7/1/2009 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Since this permit is for 2 different locations, a ESC sing is required at both projects with the same information on both signs. Also permit cannot be finalized until both project are complete.
|
Site Preparation | 6/29/2009 | 6/29/2009 | 6/29/2009 | | CANC |
Clint A Smith
|
|
|
Moved to a general inspection on 6/30/09 am
|
BMP Violation | 6/22/2009 | 6/24/2009 | 6/24/2009 | P | PART |
Clint A Smith
|
|
|
Before any concrete work occurs, a concrete washout pit must be installed.
|
INSP - Stop Work Order | 6/24/2009 | 6/24/2009 | 6/24/2009 | P | PASS |
Clint A Smith
|
|
|
on 6/12/09 a stop work order was issued due to working with a permit. A permit has been issued and all pervisions have been installed.
|
BMP Violation | 6/18/2009 | 6/22/2009 | 6/22/2009 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: (Spoke with RP Garrett Smith) 1. Remove base material constructed for the land bridge. Use an approved maerial or products. Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 6/24/09 PM.
|
Routing - Erosion and Sediment | 6/19/2009 | | 6/22/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 6/22/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/22/2009 | | DONE |
Tisha Gallop
|
|
|
customer in office, told him fees and permit is ready
|
Issue & PRINT permit COM | | | 6/22/2009 | | DONE |
|
|
|
|
Application received | | | 6/19/2009 | | |
Tisha Gallop
|
|
|
received resubmittals: two copies of narrative, checklist, inspection report and plan sheet 1, 8, and 0; routed to erosion
|
Random Inspection | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | FAIL |
Clint A Smith
|
|
|
verbal to RP: Remove all sediment debris off of all haerd surface where the land berm was established for un loading of equiptment. Will re-inspect on 6/22/09 AM
|
Routing - Erosion and Sediment | 6/12/2009 | | 6/15/2009 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet standards according to Ordinance 8-17 or the plan designer manual. Plan is required to be prepared by Boise City Certified Plan Designer. Faxed checklist to PD. Plan remains in ESC Pending box, waiting on re-submittals.
|
Application received | | | 6/12/2009 | | |
|
|
|
|