DOC - Permit Finaled | 12/9/2009 | 12/9/2009 | 12/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/17/2009 | 11/17/2009 | 11/17/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 10/8/2009 | 10/12/2009 | 10/12/2009 | A | PASS |
Dixie Fellows
|
|
|
|
General Inspection | 10/8/2009 | 10/8/2009 | 10/8/2009 | A | FAIL |
Dixie Fellows
|
|
|
craig...ask Craig to clean up garbage in front of building..i will go by mon am and check it
|
Site Preparation | 8/19/2009 | 8/20/2009 | 8/20/2009 | A | PART |
Clint A Smith
|
|
|
Need to post signage for washout after being constructed.
|
BMP Violation | 8/19/2009 | 8/19/2009 | 8/19/2009 | A | DONE |
Clint A Smith
|
|
|
Moved to a site prep for 8/20/09
|
Site Preparation | 8/11/2009 | 8/18/2009 | 8/19/2009 | A | CANC |
Clint A Smith
|
|
|
|
(F) Reprint permit | | | 8/19/2009 | | DONE |
Tisha Gallop
|
|
|
|
Site Preparation | 8/11/2009 | 8/11/2009 | 8/11/2009 | | NR |
Clint A Smith
|
|
|
Will re-inspect in one week. Left a message with the RP.
|
Issue & PRINT permit COM | | | 8/4/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/8/2009 | | 7/8/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 6/19/2009 | | |
|
|
|
|