General Inspection | 6/3/2010 | 6/3/2010 | 6/3/2010 | | DONE |
Clint A Smith
|
|
|
All work completed. Site is stabilized.
|
DOC - Permit Finaled | 6/3/2010 | 6/3/2010 | 6/3/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | PASS |
Jack Frank
|
|
|
ok
|
Site Preparation | 8/18/2009 | 8/25/2009 | 8/25/2009 | A | PASS |
Eric Strole
|
|
|
|
Site Preparation | 8/18/2009 | 8/18/2009 | 8/18/2009 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 8/11/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/25/2009 | | 6/25/2009 | | DONE |
Tim L. Woodard
|
|
|
Waiver letter approved applicant must comply with attached conditions. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2009 | | DONE |
|
|
|
|
Application received | | | 6/22/2009 | | |
|
|
|
|