Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC09-00386
StatusFinaled
Name KENNY THOMPSON
Site Address 1175 W LAKE HAZEL RD
Project NameOld Dominion Frieght Line
Customer Number 
ePlanReview 
Description
This ESC permit to cover the grading and new construction phases.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled1/31/20111/31/20111/31/2011PPASS
DetailsClint A Smith
General Inspection1/31/20111/31/20111/31/2011 DONE
DetailsClint A Smith
Permit finalled.
Site Final10/29/201011/29/201011/29/2010ANR
DetailsMike Jordan
Site Final9/30/201010/29/201010/29/2010ANR
DetailsTom Arcoraci
Site Final8/31/20109/30/20109/30/2010ANR
DetailsJim Storey
Site Final8/31/20108/31/20108/31/2010PNR
DetailsJim Storey
pending hydro seed west / north area fine grade ok.
Random Inspection8/10/20108/11/20108/11/2010APART
DetailsJim Storey
final ok south west area to be seedded soon and permit can be closed out.
Random Inspection7/7/20107/7/20107/7/2010APASS
DetailsJim Storey
Random Inspection7/6/20107/6/20107/6/2010PPASS
DetailsJim Storey
Random Inspection6/18/20106/18/20106/18/2010PPASS
DetailsJim Storey
Random Inspection6/8/20106/8/20106/8/2010PPASS
DetailsJim Storey
Random Inspection6/2/20106/2/20106/2/2010APASS
DetailsJim Storey
Random Inspection5/24/20105/24/20105/24/2010PPASS
DetailsJim Storey
Random Inspection4/29/20104/29/20104/29/2010PPASS
DetailsJim Storey
Random Inspection4/20/20104/20/20104/20/2010APASS
DetailsJim Storey
Random Inspection4/13/20104/13/20104/13/2010APART
DetailsJim Storey
need to clean up road at track out.
Random Inspection4/7/20104/7/20104/7/2010PPASS
DetailsJim Storey
Random Inspection3/26/20103/26/20103/26/2010APASS
DetailsJim Storey
Random Inspection3/23/20103/24/20103/24/2010PPASS
DetailsJim Storey
Random Inspection3/23/20103/23/20103/23/2010PPASS
DetailsJim Storey
Random Inspection3/2/20103/2/20103/2/2010PPASS
DetailsJim Storey
Random Inspection2/25/20102/26/20102/26/2010APASS
DetailsJim Storey
Random Inspection2/25/20102/26/20102/25/2010APASS
DetailsJim Storey
Random Inspection2/25/20102/25/20102/25/2010PPASS
DetailsJim Storey
Random Inspection2/16/20102/16/20102/16/2010PPASS
DetailsBill VanDegrift
Conference2/4/20102/4/20102/4/2010PDONE
DetailsClint A Smith
Spoke with RP over a hydrant flush. Will be diggining a flow channel and lining it with 10mil or geater plastic to flow to there infiltration bed. No issues as long as the water is clean and will not be picking up and sediment. Will be contacted prior to the flush to over see the completion of the trench.
Tracking Control1/25/20101/26/20101/26/2010PPASS
DetailsClint A Smith
Issues have been corrected. Told RP to have contractors clean tire off if covered with mud prior to leaving the job site by going back and forth on the construction exit.
Tracking Control1/25/20101/25/20101/25/2010PCANC
DetailsSteven Webb
duplicate
Tracking Control1/25/20101/25/20101/25/2010PPART
DetailsSteven Webb
Verbal to RP, needs top dressing on existing construction entrance, sweep road and install access controls at start of the curve in the road into the site where no rock entrance is in place. Weill follow up.
General Inspection1/19/20101/19/20101/19/2010PPASS
DetailsBob Reichert
looked ok
General Inspection1/6/20101/8/20101/7/2010APASS
DetailsClint A Smith
payment(check with Tisha)
General Inspection1/4/20101/6/20101/6/2010PPART
DetailsClint A Smith
Waiting to recieve payment for all changes made to the permit.. Will re-inspect on 1/8/10.
Telephone call  1/5/2010  
DetailsTisha Gallop
Kenny in office change RP from David Dibble to Kenny Thompson/Furst Construction and add 9 acres to permit for total 16 acres disturbed.
(F) Reprint permit  1/5/2010 DONE
General Inspection1/4/20101/4/20101/4/2010PFAIL
DetailsClint A Smith
Correction Notice given to RP:
1. Update RP person with the city.
2. Revise the ESC application with the additional area of disturbance to a quarter area accuracy. Pay additional feesif required. Will re-inspect on 1/06/10PM
Random Inspection12/28/200912/28/200912/28/2009APASS
DetailsClint A Smith
Random Inspection12/11/200912/11/200912/11/2009PPASS
DetailsClint A Smith
General Inspection12/3/200912/3/200912/3/2009PPASS
DetailsBob Reichert
looked ok
Site Preparation12/3/200912/3/200912/3/2009PPASS
DetailsJim Storey
Random Inspection11/23/200911/23/200911/23/2009PPASS
DetailsJim Storey
Random Inspection11/20/200911/20/200911/20/2009PPASS
DetailsJim Storey
Site Preparation11/2/200911/16/200911/13/2009ACANC
DetailsClint A Smith
Tracking Control11/5/200911/9/200911/9/2009APART
DetailsClint A Smith
Will be completed by the end of the day today.
Site Preparation11/3/200911/5/200911/5/2009APART
DetailsClint A Smith
Ken from Frust Construction out of Utah took the RP coarse yesterday evening. He is on the job as the General Contractor through the duration of the project.

Told RP to re-install Construction exit per the industry standard of what is consider a "stabilized construction exit". Also to deliniate the access on and off of the exit. Will re-inspect on 11/09/09 AM.
Site Preparation10/30/200911/6/200911/2/2009ACANC
DetailsClint A Smith
Contacted RP to find out the start date. It is tenitive date 2 week from today the 11/2/09. Will re-inspect on 11/16/09AM
Site Preparation10/30/200910/30/200910/30/2009 NR
DetailsClint A Smith
Issue & PRINT permit COM  10/23/2009 DONE
Routing - Erosion and Sediment7/8/2009 7/8/2009 PASS
DetailsClint A Smith
ESC plan approved with attached conditions.
Application received  6/26/2009