DOC - Permit Finaled | 1/31/2011 | 1/31/2011 | 1/31/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | | DONE |
Clint A Smith
|
|
|
Permit finalled.
|
Site Final | 10/29/2010 | 11/29/2010 | 11/29/2010 | A | NR |
Mike Jordan
|
|
|
|
Site Final | 9/30/2010 | 10/29/2010 | 10/29/2010 | A | NR |
Tom Arcoraci
|
|
|
|
Site Final | 8/31/2010 | 9/30/2010 | 9/30/2010 | A | NR |
Jim Storey
|
|
|
|
Site Final | 8/31/2010 | 8/31/2010 | 8/31/2010 | P | NR |
Jim Storey
|
|
|
pending hydro seed west / north area fine grade ok.
|
Random Inspection | 8/10/2010 | 8/11/2010 | 8/11/2010 | A | PART |
Jim Storey
|
|
|
final ok south west area to be seedded soon and permit can be closed out.
|
Random Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 6/8/2010 | 6/8/2010 | 6/8/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 6/2/2010 | 6/2/2010 | 6/2/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/24/2010 | 5/24/2010 | 5/24/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/29/2010 | 4/29/2010 | 4/29/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/20/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/13/2010 | 4/13/2010 | 4/13/2010 | A | PART |
Jim Storey
|
|
|
need to clean up road at track out.
|
Random Inspection | 4/7/2010 | 4/7/2010 | 4/7/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/23/2010 | 3/24/2010 | 3/24/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/25/2010 | 2/26/2010 | 2/26/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/25/2010 | 2/26/2010 | 2/25/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/25/2010 | 2/25/2010 | 2/25/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Bill VanDegrift
|
|
|
|
Conference | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | DONE |
Clint A Smith
|
|
|
Spoke with RP over a hydrant flush. Will be diggining a flow channel and lining it with 10mil or geater plastic to flow to there infiltration bed. No issues as long as the water is clean and will not be picking up and sediment. Will be contacted prior to the flush to over see the completion of the trench.
|
Tracking Control | 1/25/2010 | 1/26/2010 | 1/26/2010 | P | PASS |
Clint A Smith
|
|
|
Issues have been corrected. Told RP to have contractors clean tire off if covered with mud prior to leaving the job site by going back and forth on the construction exit.
|
Tracking Control | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | CANC |
Steven Webb
|
|
|
duplicate
|
Tracking Control | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, needs top dressing on existing construction entrance, sweep road and install access controls at start of the curve in the road into the site where no rock entrance is in place. Weill follow up.
|
General Inspection | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 1/6/2010 | 1/8/2010 | 1/7/2010 | A | PASS |
Clint A Smith
|
|
|
payment(check with Tisha)
|
General Inspection | 1/4/2010 | 1/6/2010 | 1/6/2010 | P | PART |
Clint A Smith
|
|
|
Waiting to recieve payment for all changes made to the permit.. Will re-inspect on 1/8/10.
|
Telephone call | | | 1/5/2010 | | |
Tisha Gallop
|
|
|
Kenny in office change RP from David Dibble to Kenny Thompson/Furst Construction and add 9 acres to permit for total 16 acres disturbed.
|
(F) Reprint permit | | | 1/5/2010 | | DONE |
|
|
|
|
General Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice given to RP: 1. Update RP person with the city. 2. Revise the ESC application with the additional area of disturbance to a quarter area accuracy. Pay additional feesif required. Will re-inspect on 1/06/10PM
|
Random Inspection | 12/28/2009 | 12/28/2009 | 12/28/2009 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/23/2009 | 11/23/2009 | 11/23/2009 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 11/2/2009 | 11/16/2009 | 11/13/2009 | A | CANC |
Clint A Smith
|
|
|
|
Tracking Control | 11/5/2009 | 11/9/2009 | 11/9/2009 | A | PART |
Clint A Smith
|
|
|
Will be completed by the end of the day today.
|
Site Preparation | 11/3/2009 | 11/5/2009 | 11/5/2009 | A | PART |
Clint A Smith
|
|
|
Ken from Frust Construction out of Utah took the RP coarse yesterday evening. He is on the job as the General Contractor through the duration of the project.
Told RP to re-install Construction exit per the industry standard of what is consider a "stabilized construction exit". Also to deliniate the access on and off of the exit. Will re-inspect on 11/09/09 AM.
|
Site Preparation | 10/30/2009 | 11/6/2009 | 11/2/2009 | A | CANC |
Clint A Smith
|
|
|
Contacted RP to find out the start date. It is tenitive date 2 week from today the 11/2/09. Will re-inspect on 11/16/09AM
|
Site Preparation | 10/30/2009 | 10/30/2009 | 10/30/2009 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 10/23/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/8/2009 | | 7/8/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions.
|
Application received | | | 6/26/2009 | | |
|
|
|
|