Site Final | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/23/2009 | 9/23/2009 | 9/23/2009 | P | PASS |
Mike Jordan
|
|
|
All BMP's removed. ok for final.
|
General Inspection | 8/17/2009 | 8/17/2009 | 8/17/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 8/7/2009 | 8/7/2009 | 8/7/2009 | A | PASS |
Doug A Poedy
|
|
|
Looks good.
|
Site Preparation | 7/29/2009 | 7/29/2009 | 7/29/2009 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/28/2009 | 7/28/2009 | 7/28/2009 | A | PART |
Jack Frank
|
|
|
|
General Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 | P | PART |
Doug A Poedy
|
|
|
Verbal to John (the rp) to make sure they are sweeping up aspault and cleaning daily.
|
Site Preparation | 7/23/2009 | 7/23/2009 | 7/23/2009 | A | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Needs to sweep hard surfaces of all demo debries and place in an approved container.
|
Issue & PRINT permit COM | | | 7/22/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/2/2009 | | 7/2/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|
Application received | | | 6/29/2009 | | |
|
|
|
|