Site Final | 8/28/2009 | 8/28/2009 | 8/28/2009 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/28/2009 | 8/28/2009 | 8/28/2009 | P | PASS |
Mike Jordan
|
|
|
Ok to final per Steve Webb. Site will need to be stabalized by Beniton const. under ESC08-00457.
|
BMP Violation | 7/29/2009 | 8/3/2009 | 8/3/2009 | A | PASS |
Eric Strole
|
|
|
|
Random Inspection | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | FAIL |
Eric Strole
|
|
|
Left verbal correction with rp to provide a construction entrance due to the tracking coming off project onto overland, maintain perimeter DI box and protect DI on corner of owyhee & overland by 8-2-09 pm. Will reinspect on 8-3-09 pm.
|
BMP Violation | 7/14/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Clint A Smith
|
|
|
inactive storm drain.
|
Site Preparation | 7/14/2009 | 7/14/2009 | 7/14/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign visable from the street. Protect storm drain within the back school playground. Will re-inspect on 7/20/09 AM.
|
Application received | | | 7/7/2009 | | |
|
|
|
|
Issue & PRINT permit COM | | | 7/7/2009 | | DONE |
|
|
|
|