Site Final | 3/12/2010 | 3/12/2010 | 3/12/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/12/2010 | 3/12/2010 | 3/12/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization completed.
|
General Inspection | 10/30/2009 | 10/30/2009 | 10/30/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 9/11/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/8/2009 | 9/8/2009 | 9/8/2009 | P | PASS |
Jack Frank
|
|
|
ok
|
Site Preparation | 8/7/2009 | 8/7/2009 | 8/10/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 8/5/2009 | 8/5/2009 | 8/5/2009 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. All excavated material is contained in backyard. No conc. washout required due to small size of job.
|
Site Preparation | 7/27/2009 | 7/27/2009 | 7/27/2009 | | NR |
Clint A Smith
|
|
|
|
Application received | | | 7/20/2009 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 7/20/2009 | | DONE |
|
|
|
|