Site Final | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is now completed.
|
Site Final | 10/16/2009 | 10/16/2009 | 10/19/2009 | P | FAIL |
Clint A Smith
|
|
|
Lot is not fully stabilized yet. Still need to remove debris box and all concrete washout plus stabilize the lot and achieve vegitative growth.
|
Site Final | 10/8/2009 | 10/8/2009 | 10/8/2009 | P | FAIL |
Mike Jordan
|
|
|
final stabalization has not yet been completed.
|
BMP Violation | 9/10/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Mike Jordan
|
|
|
All blowable trash has been picked up.
|
General Inspection | 9/9/2009 | 9/9/2009 | 9/9/2009 | A | PART |
Mike Jordan
|
|
|
ESC permit sign is posted. BMP;s in place. Needs o pick up blowable trash. Verbal c/n give to RP.
|
Random Inspection | 8/11/2009 | 8/11/2009 | 8/11/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/10/2009 | 8/10/2009 | 8/10/2009 | | PASS |
Mike Jordan
|
|
|
ESC permit sign is posted. comnc. washout in place. BMP's in place. General site conditions were good. ok for conc.
|
Site Preparation | 8/6/2009 | 8/6/2009 | 8/6/2009 | P | FAIL |
Mike Jordan
|
|
|
No ESC sign posted. No concrete washout noted. Needs to sweep all hard surfaces of sediment. No BMP's. RP was notified by verbal c/n over phone. No concrete is allowed until issues have been resolved.
|
Issue & PRINT permit SFD | | | 8/3/2009 | | DONE |
|
|
|
|
Application received | | | 7/24/2009 | | |
|
|
|
|