Site Preparation ESC | 8/24/2009 | 8/24/2009 | 8/24/2009 | | DONE |
Clint A Smith
|
|
|
work is complete. took down the metal structure. No disurbed soil.
|
DOC - Permit Finaled | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 8/17/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 8/13/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/13/2009 | | 8/13/2009 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|