Site Final | 8/25/2010 | 8/25/2010 | 8/25/2010 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 | A | PASS |
Clint A Smith
|
|
|
No uissues present.
|
Routing - Erosion and Sediment | 4/26/2010 | | 4/26/2010 | | DONE |
Steven Webb
|
|
|
Permit is ok to modify which will include minor work as explained per the attached letter dated April 22, 2010. This modification includes filling in the existing storm drain pond and then adding 612 LF of storm drain pipe and and new 10, 437 SF detention basin.
|
General Inspection | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | PASS |
Steven Webb
|
|
|
|
Site Preparation ESC | 8/26/2009 | 8/26/2009 | 8/26/2009 | | CANC |
Steven Webb
|
|
|
Duplicate
|
Site Preparation ESC | 8/26/2009 | 8/26/2009 | 8/26/2009 | | CANC |
Steven Webb
|
|
|
Duplicate
|
Site Preparation | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | PASS |
Eric Strole
|
|
|
|
Issue & PRINT permit SFD | | | 8/19/2009 | | DONE |
|
|
|
|
Application received | | | 8/18/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/18/2009 | | 8/18/2009 | | PASS |
Clint A Smith
|
|
|
OK PER CLINT WITH ATTACHED CONDITIONS
|