DOC - Permit Finaled | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/18/2009 | 9/21/2009 | 9/21/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/18/2009 | 9/18/2009 | 9/18/2009 | A | FAIL |
Clint A Smith
|
|
|
Talked with the contractor: Protect the stockpile with a sediment barrier along the down hill slope to the storm drain. Protect all storm drains with an approved storm drain inlet protection. Post ESC sign in the area of the stock pile. Will re-inspect on 9/21/09AM.
|
Site Preparation | 9/2/2009 | 9/2/2009 | 9/3/2009 | | NR |
Mike Jordan
|
|
|
|
Issue & PRINT permit COM | | | 8/26/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/21/2009 | | 8/24/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2009 | | |
|
|
|
|
Telephone call | | | 8/24/2009 | | DONE |
Tisha Gallop
|
|
|
Called Jeff Towner (applicant) and left vm that permit is ready and fee//8/24/09 LEG
|
Permit Ready to Issue | | | 8/24/2009 | | DONE |
|
|
|
|
Application received | | | 8/21/2009 | | |
|
|
|
|