Site Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok, back not planted yet
|
General Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 | A | PASS |
Jack Frank
|
|
|
site ok
|
Site Preparation | 9/7/2009 | 9/7/2009 | 9/8/2009 | | PASS |
Jim Johnson
|
|
|
signage posted and concret wash out on site down stream B M P in place
|
Site Preparation | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PART |
Jim Sly
|
|
|
Pete ###-#### Notified RP.....Need sign and Concrete wash out prior to pouring.
|
Issue & PRINT permit SFD | | | 8/31/2009 | | DONE |
|
|
|
|
Application received | | | 8/26/2009 | | |
|
|
|
|