Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberESC09-00544
StatusFinaled
Name NORMAN NIEBUHR
Site Address 7415 W FAIRVIEW AVE
Project NameCole Elementary
Customer Number 
ePlanReview 
Description
demolition
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled1/21/20101/21/20101/21/2010PPASS
DetailsClint A Smith
Site Final1/11/20101/11/20101/11/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Ease back the grade of the exit and add additional 2" or greater washed rock to bothe ends of the exit. Once complete contact for a re-inspection.
BMP Violation12/2/200912/4/200912/4/2009APART
DetailsClint A Smith
Will be sweeping up the rest of the hard surfaces that have ot been completed. Also activily using water to surpress dust.
Complaint Inspection12/2/200912/2/200912/2/2009PFAIL
DetailsClint A Smith
Message to RP:
CORRECTION NOTICE:
1. Per conditions of permit a misting system is required to elevate moisture content with soil and debris pile and also when demolition is occuring.
2. Clean up all hard surface of all loose sediment.
Failure to comply with notice will result in a STOP WORK ORDER.
Will re-inspect on 12/4/09AM.
Tracking Control11/24/200911/27/200911/27/2009APASS
DetailsClint A Smith
Tracking Control11/24/200911/24/200911/24/2009AFAIL
DetailsClint A Smith
Message to RP:
Clean up all tracking onto Fairview. Remove landbridge off of the construction exit. Add additional rock to the west of the construction exit. Will re-inspect on 11/27/09 am.
Site Preparation9/10/20099/10/20099/10/2009 PART
DetailsJim Johnson
no construction activity on site at this time
Issue & PRINT permit COM  9/3/2009 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment9/1/2009 9/2/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. Bond cannot be released until the site has achieved stabilization. ESC09-00544
Application received  9/1/2009  
DetailsTisha Gallop
received resubmittals: two copies of narrative and ESC plan (1) sheet; routed to ESC
Routing - Erosion and Sediment8/26/2009 8/27/2009 FAIL
DetailsSteven Webb
ESC plan does not meet the requirments of 8-17. Checklist faxed to PD. Re-submittal is required. Plan is located in ESC Pending box.
Application received  8/26/2009