Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC09-00550
StatusFinaled
Name DALE HOPE
Site Address 419 S MARDEN ST
Project Namedemo
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/12/20102/12/20102/12/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled2/12/20102/12/20102/12/2010PPASS
DetailsDave Hannah
Conference9/14/20099/15/20099/15/2009PCANC
DetailsSteven Webb
2:00 with Clint.
Conference9/10/20099/14/20099/14/2009PDONE
DetailsSteven Webb
2:00-3:00: Meet with property owner and Boise City Parks & Rec. staff. Reviewed site and upcoming work for entire lot. Submittal should be forthcoming for the entire 1.79 acres.
Site Preparation9/10/20099/10/20099/10/2009PPART
DetailsSteven Webb
Posted stop work order, misc construction equipment on site. Reviewed requirements with owner (Tracey). Will meet on Monday.
Conference9/9/20099/10/20099/10/2009ACANC
DetailsSteven Webb
Meeting re-scheduled for Monday, Sept. 14th due to schedule conflict with property owner.
BMP Violation9/4/20099/9/20099/9/2009AFAIL
DetailsSteven Webb
Talked to property owner, (property is 1.79 acres). Discuss violations, i.e. working without a permit, site unstablized, unprotected storm drain, inadequate access. Owner is working on getting grading submittals ready to hand in to Boise City, (was informed that an ESC plan and permit will be required as well. Part of property according to owner belongs to Boise City Parks and Rec. Talked to Maria L. (Parks), requested a meeting with Parks and property owner to discuss issues and to communicate measures needed to receive compliance. Will schedule a on-site meeting within a short time frame.
Site Preparation9/4/20099/4/20099/4/2009 FAIL
DetailsSteven Webb
Demo: Area of disturbance greater than .25 which was included in the permit. Project located in enviornmentaly sensitive area, irrigation canel and Boise River area plus ditch running through project (water in ditch) Drop inlet not protected. Structure is gone but site is not stabilized. Called RP but had to leave a message with his office. Requested a call back. Will follow up next week.
Application received  8/28/2009  
Issue & PRINT permit SFD  8/28/2009 DONE