Site Final | 4/8/2010 | 4/8/2010 | 4/8/2010 | P | PASS |
Troy James
|
|
|
|
Site Preparation | 9/8/2009 | 9/8/2009 | 9/8/2009 | | PASS |
Eric Strole
|
|
|
|
BMP Violation | 9/2/2009 | 9/3/2009 | 9/3/2009 | A | PASS |
Eric Strole
|
|
|
|
Site Preparation | 9/1/2009 | 9/2/2009 | 9/2/2009 | A | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to install di protection by days end & install barrier protection around stock pile or remove stock pile.
|
Routing - Erosion and Sediment | 9/1/2009 | | 9/1/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 9/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2009 | | DONE |
Barbara Stitt
|
|
|
Called and left voice message for Terry Leighton that permit is ready & fees due///9-1-09 @ 8:45am BAS
|
Issue & PRINT permit COM | | | 9/1/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 8/31/2009 | | |
|
|
|
|