General Inspection | 12/17/2010 | 12/17/2010 | 12/17/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 12/17/2010 | 12/17/2010 | 12/17/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
General Inspection | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 3/11/2010 | 3/11/2010 | 3/11/2010 | P | PASS |
Bill VanDegrift
|
|
|
|
Random Inspection | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | PASS |
Dixie Fellows
|
|
|
josh is the contact...clean
|
Random Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 12/29/2009 | 12/29/2009 | 12/29/2009 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PASS |
Dixie Fellows
|
|
|
SITE AND PROTECTION OK
|
General Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 | P | PASS |
Jack Frank
|
|
|
ok
|
General Inspection | 9/30/2009 | 10/1/2009 | 10/1/2009 | A | CANC |
Dixie Fellows
|
|
|
josh is the contact
|
Random Inspection | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 9/16/2009 | 9/16/2009 | 9/16/2009 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 9/15/2009 | 9/15/2009 | 9/15/2009 | | PASS |
Eric Strole
|
|
|
|
Issue & PRINT permit SFD | | | 9/8/2009 | | DONE |
|
|
|
|
Application received | | | 9/4/2009 | | DONE |
Tisha Gallop
|
|
|
received two copies of revised ESC plan and narrative; routed to ESC
|
Routing - Erosion and Sediment | 9/4/2009 | | 9/4/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - Erosion and Sediment | 9/1/2009 | | 9/2/2009 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet the requirements per BMC 8-17 or the plan designer manual. Sent applicant a completed Plan Review Checklist via e-mail. Re-submittal will be required.
|
Application received | | | 9/1/2009 | | |
|
|
|
|