Site Final | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | PASS |
Jim Sly
|
|
|
OK
|
DOC - Permit Finaled | 3/15/2010 | 3/15/2010 | 3/15/2010 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 3/11/2010 | 3/12/2010 | 3/12/2010 | A | NR |
Jim Sly
|
|
|
Shawn phone
|
Random Inspection | 12/28/2009 | 12/28/2009 | 12/28/2009 | P | PART |
Jim Sly
|
|
|
Talked to RP....Need to replace sign.
|
BMP Violation | 11/19/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 11/19/2009 | 11/23/2009 | 11/19/2009 | A | CANC |
Clint A Smith
|
|
|
|
BMP Violation | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: 1. Clean up all hard sufrace of sediment and debris. 2. Relocate orter pottie of of sidewalk onto the lot. 3. Clean up all concrete washout and residual that is at the front of lot and on the gutterpan. Will re-inspect on 11/23/09am.
|
Site Preparation | 11/10/2009 | 11/10/2009 | 11/17/2009 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Jim Sly
|
|
|
Shawn phone
|
Site Preparation | 11/6/2009 | 11/6/2009 | 11/6/2009 | P | PASS |
Jim Sly
|
|
|
Shawn phone
|
Issue & PRINT permit SFD | | | 11/3/2009 | | DONE |
|
|
|
|
Application received | | | 9/23/2009 | | |
|
|
|
|