Site Final | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is now completed.
|
Site Final | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | FAIL |
Mike Jordan
|
|
|
Final stabalization has not been completed.
|
General Inspection | 12/11/2009 | 12/11/2009 | 12/11/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/12/2009 | 11/12/2009 | 11/12/2009 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | CANC |
Clint A Smith
|
|
|
duplicate.
|
Site Preparation | 10/16/2009 | 10/16/2009 | 10/16/2009 | A | PASS |
Mike Jordan
|
|
|
Site prep ok. ok to proceed eith conc.
|
Override - Parcel Holds | 10/16/2009 | 1/1/1900 | 10/16/2009 | | |
|
|
|
ESC inspection to resolve issues
|
Override - Parcel Holds | 10/16/2009 | 1/1/1900 | 10/16/2009 | | |
|
|
|
this inspection is to clear this issue up
|
Site Preparation | 10/15/2009 | 10/15/2009 | 10/15/2009 | | FAIL |
Mike Jordan
|
|
|
Silt fence was not installed properly. Bottom should extend 6 to 8 inches below surface and extend to east property line.
|
Site Preparation | 10/12/2009 | 10/12/2009 | 10/12/2009 | P | FAIL |
Mike Jordan
|
|
|
Silt fence not yet installed. Conc. washout was not used. A stopwork has been put on this job until silt fence is installed and conc. has been cleaned up from the site.
|
Site Preparation | 10/9/2009 | 10/9/2009 | 10/9/2009 | A | PART |
Mike Jordan
|
|
|
ESC permit sign and concrete washout pit hace been provided. Needs to install silt fence along east property line were excavated materila is stockpiled. c/n given to RP.
|
Issue & PRINT permit SFD | | | 10/8/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 10/1/2009 | | |
|
|
|
|