Site Final | 12/24/2009 | 12/24/2009 | 12/24/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 12/10/2009 | 12/10/2009 | 12/10/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/9/2009 | 11/9/2009 | 11/9/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/2/2009 | 11/2/2009 | 11/2/2009 | A | PASS |
Bill VanDegrift
|
|
|
|
Site Preparation | 10/22/2009 | 10/22/2009 | 10/22/2009 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Re-install the sediment barrier at the front of lot per industry standards. All in all, site looks good.
|
Random Inspection | 10/19/2009 | 10/19/2009 | 10/19/2009 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/16/2009 | 10/16/2009 | 10/16/2009 | P | PASS |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 10/15/2009 | | DONE |
|
|
|
|
Application received | | | 10/12/2009 | | |
|
|
|
|