General Inspection | 12/20/2010 | 12/20/2010 | 12/20/2010 | | DONE |
Clint A Smith
|
|
|
Permit was finalled.
|
DOC - Permit Finaled | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 2/9/2010 | 2/9/2010 | 2/9/2010 | P | NR |
Jim Sly
|
|
|
Need to complete landscaping.
|
Random Inspection | 1/15/2010 | 1/15/2010 | 1/15/2010 | P | PASS |
Jim Sly
|
|
|
Ray phone
|
BMP Violation | 12/29/2009 | 12/31/2009 | 12/31/2009 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 12/29/2009 | 12/29/2009 | 12/29/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier along the back of sidewalk on the perimeter of lot. Will re-inspect on 12/31/09 am.
|
Site Preparation | 12/28/2009 | 12/29/2009 | 12/29/2009 | A | PASS |
Jim Sly
|
|
|
Ray phone
|
Site Preparation | 12/11/2009 | 12/11/2009 | 12/11/2009 | | NR |
Clint A Smith
|
|
|
Will contacted by RP prior to start date for the site preperation inspection.
|
Issue & PRINT permit SFD | | | 12/4/2009 | | DONE |
|
|
|
|
Application received | | | 10/15/2009 | | |
|
|
|
|