Aging Inspection | 3/30/2011 | 3/30/2011 | 3/30/2011 | | DONE |
Clint A Smith
|
|
|
PErmit Finaled. Verical work is attached to ESC10-00456
|
DOC - Permit Finaled | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/24/2011 | 1/28/2011 | 1/28/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/24/2011 | 1/24/2011 | 1/24/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of the parking lot. Will re-inspect on 1/24/2011 AM.
|
BMP Violation | 11/22/2010 | 11/22/2010 | 11/22/2010 | A | PART |
Clint A Smith
|
|
|
Site looks beter. Informed the RP that if activities create tracking that all treacked out material onto the hard surfaces must be cleaned up by the end of the day or prior to any storm events.
|
Tracking Control | 11/16/2010 | 11/19/2010 | 11/22/2010 | A | FAIL |
Clint A Smith
|
|
|
On 11/19/2010 a correction notice was given for the following issues:
1. Clean up all sediment debris off of all hard surfaces. 2. Maintain all storm drain inlet protection when practiable 3. Place all trash debris within the container that is provided. Failure to comply will result in a stop work order. This will be the last notice given. All further enforcement will result in stop work orders. Will re-inspect on 11/22/2010AM.
|
General Inspection | 11/16/2010 | 11/16/2010 | 11/16/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris on all hard surfaces within the parking lot area. Will re-inspect on 11/19/2010am.
|
BMP Violation | 10/18/2010 | 10/22/2010 | 10/22/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Clean up all sediment and debris off of all hard surfaces.
|
General Inspection ESC | 10/18/2010 | 10/18/2010 | 10/18/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to subsitute RP: Protect the Field drain with the south west section of the south area where all soil is disturbed. Where all dirt is disturbed to eliminate traffic on and off to the hard surfaces or to install a stabilized construction exit to reduce sediment tracking deposits onto the hardsurface of the parking lot. Will re-inspect on 10/22/2010am
|
General Inspection ESC | 8/17/2010 | 8/17/2010 | 8/17/2010 | | PART |
Clint A Smith
|
|
|
No activty.
|
General Inspection | 6/17/2010 | 6/17/2010 | 6/17/2010 | P | PASS |
Steven Webb
|
|
|
|
General Inspection ESC | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
Tracking Control | 12/1/2009 | 12/7/2009 | 12/7/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PART |
Bob Reichert
|
|
|
see 460 comments
|
General Inspection | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Clean up all hardsurface of all sediment and debris. 2. Install a stabilized construction exit off of disurbed area. Will re-inspect on 12/7/09PM
|
BMP Violation | 11/17/2009 | 11/18/2009 | 11/18/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/17/2009 | 11/17/2009 | 11/17/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Protect all storm drains within the parking lot area with approved storm drain inlet protection. 2. Install a stabilized construction exit per boise city standards field guide. Will re-inspect on 11/18/09 PM.
|
Routing - Erosion and Sediment | 11/10/2009 | | 11/10/2009 | | PASS |
Steven Webb
|
|
|
ESC plan with addendum No. 1 is approved with attached conditions.
|
Issue & PRINT permit SFD | | | 11/10/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/2/2009 | | 11/2/2009 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet requirments per BCC 8-17; Plan does not cover project type which is being applied for, (parking lot, grading, fencing & landscaping). The plan submitted includes demolishing an existing vacant structure, remodel another building and two additional new structures. No full size drawings. Informed applicant via telephone. Plan does need to be specific to the project.
|
Application received | | | 10/27/2009 | | |
|
|
|
|