Site Final | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Final | 4/26/2010 | 4/27/2010 | 4/27/2010 | A | PART |
Tom Arcoraci
|
|
|
|
Site Final | 4/23/2010 | 4/26/2010 | 4/26/2010 | A | PART |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/23/2010 | 4/23/2010 | 4/23/2010 | P | PART |
Tom Arcoraci
|
|
|
|
General Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, Scott. Sign is posted but lettering has faded, Scott will re-do.
|
Random Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 11/30/2009 | 12/1/2009 | 12/1/2009 | A | PASS |
Clint A Smith
|
|
|
Verbal to RP: Site looks good. Just a reminder that a concrete washout is required prior to the placement of any concrete. Will be constructing a external washout with a vinyl lining.
|
General Inspection | 11/5/2009 | 11/9/2009 | 11/9/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/5/2009 | 11/5/2009 | 11/5/2009 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign where it is visable from the street. Will re-inspect on 11/09/09 AM.
|
Issue & PRINT permit COM | | | 10/29/2009 | | DONE |
|
|
|
|
Application received | | | 10/28/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/28/2009 | | 10/28/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. This approved plan and permit is for the demo of the existing pool and re-construction of the new pool.
|
Case Summary (ESC) | | | 10/28/2009 | | |
|
|
|
|
(F) Reprint permit | | | 10/28/2009 | | |
|
|
|
|