Site Final | 5/14/2010 | 5/14/2010 | 5/14/2010 | A | CANC |
Jim Storey
|
|
|
|
Site Final | 5/14/2010 | 5/14/2010 | 5/14/2010 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | CANC |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 3/8/2010 | 3/8/2010 | 3/8/2010 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Bob Reichert
|
|
|
|
Site Preparation | 2/1/2010 | 2/2/2010 | 2/2/2010 | A | PASS |
Clint A Smith
|
|
|
Referred RP to the a type of product that would work for the drain inlets that he can not pull up for his inlet protection.
|
Site Preparation | 1/27/2010 | 2/1/2010 | 2/1/2010 | A | CANC |
Clint A Smith
|
|
|
8:30am on 2/2/10 am.
|
General Inspection | 1/28/2010 | 1/28/2010 | 1/28/2010 | P | PART |
Bob Reichert
|
|
|
only saw inside, nr outside
|
Random Inspection | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | NR |
Jim Storey
|
|
|
|
Site Preparation | 1/27/2010 | 1/27/2010 | 1/27/2010 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 1/20/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/10/2009 | | 11/10/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. RP required prior to start of construction. Inform Boise City, Swebb@cityofboise.org
|
Application received | | | 11/9/2009 | | |
|
|
|
|