Aging Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 | | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 3/16/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Steven Webb
|
|
|
|
Random Inspection | 8/31/2010 | 8/31/2010 | 8/31/2010 | P | PART |
Bill VanDegrift
|
|
|
looks ok
|
BMP Violation | 3/11/2010 | 3/12/2010 | 3/12/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: (Message to RP C/N posted at jobsite. ) 1. Install a sediment barrier along the North East end of project area. 2. Install access controls to delineate access on and off of the project area. 3. Stabilize all disturbed soil that is or will be inactive for 14 days or greater. * Failure to comply will result in further enforcement. Will re-inspect on 2/12/10 PM
|
General Inspection | 12/18/2009 | 12/18/2009 | 12/18/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/30/2009 | 12/1/2009 | 12/1/2009 | A | PASS |
Clint A Smith
|
|
|
sets have been taken to pump clean ground water to lwer the level from where they are excavating at. The turbid water will be directed to a sttling area prior to reaching the discharge point.
|
Complaint Inspection | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PART |
Clint A Smith
|
|
|
Went over detail regarding there dewatering operation and what they are required to meet prior to them discharging into the MS4 system on Parkcenter Blvd. Must not allow any turbid water into the storm drain where discharge point is located. Also must submit a dewatering plan to city of boise for review. Will re-inspect on 12/1/09AM.
|
Site Preparation ESC | 11/17/2009 | 11/17/2009 | 11/17/2009 | | CANC |
Steven Webb
|
|
|
Site preparation inspection has been completed by inspector 460
|
General Inspection | 11/12/2009 | 11/16/2009 | 11/16/2009 | A | CANC |
Clint A Smith
|
|
|
DEWATER
|
General Inspection | 11/13/2009 | 11/13/2009 | 11/13/2009 | P | PASS |
Clint A Smith
|
|
|
No issue of dewatering that were a concern from ACHD.
|
Site Preparation | 11/12/2009 | 11/12/2009 | 11/12/2009 | A | PASS |
Clint A Smith
|
|
|
Told RP and also ther PD that prior to any dewater activies occuring that they must submit a dewatering plan to the city and recieve an approval on the plan prior to the activity occuring. Will re-inspect on 11/16/09AM.
|
INSP - Stop Work Order | 11/12/2009 | 11/12/2009 | 11/12/2009 | A | PASS |
Clint A Smith
|
|
|
Stop work order put in place due to working without a city ESC permit on 11/09/09. Permit has been issued. Stop work order has been lifted. All EC provisions are in place and actively working.
|
Application received | | | 11/10/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/10/2009 | | 11/10/2009 | | PASS |
Steven Webb
|
|
|
ESC plan along with permit conditions are approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2009 | | |
|
|
|
|
Telephone call | | | 11/10/2009 | | DONE |
|
|
|
t/c w brian at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/10/2009 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/10/2009 | | DONE |
|
|
|
|