Site Final | 3/5/2010 | 3/5/2010 | 3/5/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | A | PASS |
Dixie Fellows
|
|
|
PERRY IS THE CONTACT..SITE CLEAN
|
Site Preparation | 11/17/2009 | 11/17/2009 | 11/17/2009 | A | CANC |
Clint A Smith
|
|
|
duplicate.
|
Site Preparation | 11/17/2009 | 11/17/2009 | 11/17/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide a washout pit prior to concrete pour. Move ESC sign to the front of lot so it is visable from the street. Will be re-inspected apon footing inspection.
|
Application received | | | 11/10/2009 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 11/10/2009 | | DONE |
Tisha Gallop
|
|
|
|