Aging Inspection | 3/18/2011 | 3/18/2011 | 3/23/2011 | | DONE |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 3/23/2011 | 3/23/2011 | 3/23/2011 | P | PASS |
Jim Johnson
|
|
|
|
BMP Violation | 11/23/2009 | 11/25/2009 | 11/25/2009 | A | DONE |
Clint A Smith
|
|
|
|
Site Preparation ESC | 11/23/2009 | 11/23/2009 | 11/23/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Re-install the stabilzed construction exit per industry standards using a geotextile fabric underneath the basalt cobble. Protect storm drain that is to the north west on Kimball pl. Will re-inspect on 11/25/09AM.
|
Override - Parcel Holds | | | 11/16/2009 | | |
|
|
|
|
Issue & PRINT permit COM | | | 11/16/2009 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 11/12/2009 | | 11/13/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2009 | | |
|
|
|
|
Override - Parcel Holds | | | 11/13/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 11/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/13/2009 | | DONE |
|
|
|
Called and left message for Dan Bastian and told him that permit is ready and fees due///11-13-09 @ 10:06am BAS
|
Application received | | | 11/12/2009 | | |
|
|
|
|