Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC09-00733
StatusFinaled
Name DEAN H BAKE
Site Address 5521 W VICTORY RD
Project Name 
Customer Number 
ePlanReview 
Description
Bridge Support Structure
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC8/9/20108/9/20108/9/2010 DONE
DetailsClint A Smith
Site Final6/7/20108/9/20108/9/2010APASS
DetailsClint A Smith
General Inspection ESC6/7/20106/7/20106/7/2010 PART
DetailsClint A Smith
Spoek with RP over final stabilization. They hand broadcasted a seed blend. They will be re-applying the seed blend. Will re-inspect in 2 months for a site final.
Random Inspection4/7/20104/7/20104/7/2010APASS
DetailsClint A Smith
Tracking Control1/11/20101/13/20101/13/2010APASS
DetailsClint A Smith
Tracking Control1/11/20101/11/20101/11/2010AFAIL
DetailsClint A Smith
Verbal to RP:
CLean up all tracking onto S. Orchard rd from project. Also maintain the construction exit by adding additional rock in areas where vechiles are driving off of the sides. Will re-inspect on 1/13/09am.
Site Preparation11/23/200911/23/200911/23/2009 PASS
DetailsClint A Smith
Tracking Control11/16/200911/18/200911/18/2009APASS
DetailsClint A Smith
Site Preparation11/16/200911/16/200911/16/2009PPART
DetailsClint A Smith
Need to install all three construction exits. Will not require geo-textile fabric under rock due to the good base already. Will re-inspect on 11/18/09 PM.
INSP - Stop Work Order11/16/200911/16/200911/16/2009PPASS
DetailsClint A Smith
Stop work order pulled due to permit being issued per Clint Smith
Routing - Erosion and Sediment11/16/2009 11/16/2009 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  11/16/2009  
Permit Ready to Issue  11/16/2009 DONE
Issue & PRINT permit COM  11/16/2009 DONE
Application received  11/13/2009