General Inspection ESC | 8/9/2010 | 8/9/2010 | 8/9/2010 | | DONE |
Clint A Smith
|
|
|
|
Site Final | 6/7/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection ESC | 6/7/2010 | 6/7/2010 | 6/7/2010 | | PART |
Clint A Smith
|
|
|
Spoek with RP over final stabilization. They hand broadcasted a seed blend. They will be re-applying the seed blend. Will re-inspect in 2 months for a site final.
|
Random Inspection | 4/7/2010 | 4/7/2010 | 4/7/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/11/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all tracking onto S. Orchard rd from project. Also maintain the construction exit by adding additional rock in areas where vechiles are driving off of the sides. Will re-inspect on 1/13/09am.
|
Site Preparation | 11/23/2009 | 11/23/2009 | 11/23/2009 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 11/16/2009 | 11/18/2009 | 11/18/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PART |
Clint A Smith
|
|
|
Need to install all three construction exits. Will not require geo-textile fabric under rock due to the good base already. Will re-inspect on 11/18/09 PM.
|
INSP - Stop Work Order | 11/16/2009 | 11/16/2009 | 11/16/2009 | P | PASS |
Clint A Smith
|
|
|
Stop work order pulled due to permit being issued per Clint Smith
|
Routing - Erosion and Sediment | 11/16/2009 | | 11/16/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 11/16/2009 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/16/2009 | | DONE |
|
|
|
|
Application received | | | 11/13/2009 | | |
|
|
|
|