Aging Inspection | 3/22/2011 | 3/22/2011 | 3/22/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 3/22/2011 | 3/22/2011 | 3/22/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/10/2009 | 12/15/2009 | 12/15/2009 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation ESC | 12/10/2009 | 12/10/2009 | 12/10/2009 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at front of job where visable from the street. If tracking starts to occur a stabilized construction exit will be expected. Will re-inspect on 12/15/09am.
|
Issue & PRINT permit SFD | | | 12/3/2009 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/1/2009 | | 12/2/2009 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 12/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/2/2009 | | DONE |
Barbara Stitt
|
|
|
Called and left a message with Martha that permit is ready & fees due///12-2-09 @ 9:05am BAS
|
Application received | | | 12/1/2009 | | |
|
|
|
|