Aging Inspection | 9/26/2011 | 9/26/2011 | 9/26/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 | | CANC |
Alan Hauser
|
|
|
|
Aging Inspection | 5/23/2011 | 5/23/2011 | 5/23/2011 | | DONE |
Jack Frank
|
|
|
could not locate
|
Aging Inspection | 3/23/2011 | 3/23/2011 | 3/23/2011 | | CANC |
Alan Hauser
|
|
|
|
BMP Violation | 3/2/2010 | 3/4/2010 | 3/5/2010 | A | PART |
Clint A Smith
|
|
|
|
BMP Violation | 3/1/2010 | 3/2/2010 | 3/2/2010 | P | PART |
Clint A Smith
|
|
|
|
General Inspection | 3/1/2010 | 3/1/2010 | 3/1/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction: (Message to RP:) 1. Clean up all sediment off of hard surfaces. 2. Clean up all concrete wash and provides a washout pit for further clean out. Will re-inspect on 3/2/10 PM.
|
INSP - Stop Work Order | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | PASS |
Clint A Smith
|
|
|
|
INSP - Stop Work Order | 1/22/2010 | 1/22/2010 | 1/22/2010 | P | CANC |
Clint A Smith
|
|
|
duplicate.
|
INSP - Stop Work Order | 1/22/2010 | 1/22/2010 | 1/22/2010 | A | FAIL |
Clint A Smith
|
|
|
Stop Work Order posted Verbal requirements to RP: 1. CLean up all sediment and debris off of all hard surfaces at the corner of Whisperwood and Archstone. 2. Install a proper construction exit. 3. Install access controls on the front section of the project area. Must call in for a re-inspection once complete with all of the actions required to have the stop work order lifted.
|
Tracking Control | 1/21/2010 | 1/22/2010 | 1/22/2010 | A | FAIL |
Clint A Smith
|
|
|
Moved to a stop work order.
|
Tracking Control | 1/21/2010 | 1/21/2010 | 1/21/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: (message to RP) CLean up all sediment and debris off of all hard surfaces. ** Failure to comply will result in a stop work order. Will re-inspect on 1/22/10 AM.
|
Tracking Control | 1/7/2010 | 1/8/2010 | 1/8/2010 | A | PART |
Clint A Smith
|
|
|
|
Tracking Control | 1/5/2010 | 1/7/2010 | 1/7/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP; Correction Notice: 1.Clean up all sediment anddebris off of all hardsurfaces. 2. Install a proper construction exit per industry standards. Failure to comply with the notice will result in a stop work order.
|
Site Preparation | 12/29/2009 | 1/5/2010 | 1/5/2010 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Post ESC signs where visable from the street. Clean up all sediment and debris tracking onto the hard surfaces. Will re-inspect on 1/7/09am.
|
Site Preparation | 12/29/2009 | 12/29/2009 | 12/29/2009 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 12/22/2009 | | DONE |
|
|
|
|
Application received | | | 12/4/2009 | | |
|
|
|
|