General Inspection | 12/21/2010 | 12/21/2010 | 12/21/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | | CANC |
Steven Webb
|
|
|
|
General Inspection | 3/19/2010 | 3/19/2010 | 3/19/2010 | P | CANC |
Bob Reichert
|
|
|
wrong request
|
General Inspection | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. BMP's in place. contractor using plastic swimming pools for washout and cleanup. Noted heavy rain, no trackout noted, all excavations are contained in backyard.
|
Site Preparation | 12/16/2009 | 12/23/2009 | 12/23/2009 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 12/16/2009 | 12/16/2009 | 12/16/2009 | | NR |
Clint A Smith
|
|
|
|
Application received | | | 12/9/2009 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/9/2009 | | 12/9/2009 | | DONE |
Carl D Madsen
|
|
|
Approved per the attached conditions. CDM
|
Issue & PRINT permit SFD | | | 12/9/2009 | | DONE |
|
|
|
|