Site Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Final | 6/22/2010 | 6/23/2010 | 6/23/2010 | A | PART |
Tom Arcoraci
|
|
|
|
General Inspection | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 1/19/2010 | 1/20/2010 | 1/20/2010 | A | PASS |
Clint A Smith
|
|
|
|
Conference | 1/15/2010 | 1/19/2010 | 1/19/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the job site. And protect the storm drain inlets with approved storm drain inlet protection on Morris Hill rd. Will re-inspect on 1/20/10 AM.
|
General Inspection | 1/14/2010 | 1/15/2010 | 1/15/2010 | P | PART |
Clint A Smith
|
|
|
Message to GC: Could not reach RP. Left a message with the GC for a confrence with the RP and the GC to go over the requiremenst that follow with the RP of the project. Will re-inspect on 1/19/10 AM
|
General Inspection | 1/14/2010 | 1/14/2010 | 1/15/2010 | P | CANC |
Clint A Smith
|
|
|
wrong date
|
General Inspection | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: (message to G.C.) Provide a Valid RP with the CON # also for the project to have day to day controls over operations for the duration of the whole project. Failure to comply will result in a stop work order. Will re-inspect on 1/15/10 PM.
|
Site Preparation | 1/11/2010 | 1/11/2010 | 1/12/2010 | | PART |
Dave Hannah
|
|
|
all dirt on site can't go anywere no inlet drains in this area excavation and durt is in back yard
|
Issue & PRINT permit SFD | | | 1/4/2010 | | DONE |
|
|
|
|
Application received | | | 12/14/2009 | | |
|
|
|
|