Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC09-00791
StatusFinaled
Name DAVID M FLORES
Site Address 1421 N FIVE MILE RD
Project Name 
Customer Number 
ePlanReview 
Description
Project Lay Down Area
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/2/20116/6/20116/6/2011ADONE
DetailsClint A Smith
DOC - Permit Finaled6/6/20116/6/20116/6/2011PPASS
DetailsClint A Smith
Site Final5/4/20116/4/20116/2/2011ACANC
DetailsClint A Smith
Wrong Date
Site Final4/4/20115/4/20115/4/2011ANR
DetailsClint A Smith
Site Final3/4/20114/4/20114/4/2011ANR
DetailsClint A Smith
General Inspection2/25/20113/4/20113/4/2011APASS
DetailsClint A Smith
Will re-inspect for growth in one month.
Site Final2/11/20112/25/20112/25/2011ADONE
DetailsClint A Smith
Due to the weather conditions. Will re-inspect next week on 3/4/2011
General Inspection2/8/20112/11/20112/11/2011AFAIL
DetailsClint A Smith
Correction Notice:(message to RP)
Initiate final stabilization measure s on all disturded soil within the project laydown area. Failure to comply will result in further enforcement. Will re-inspect on 2/25/2011
General Inspection2/8/20112/8/20112/8/2011 PART
DetailsClint A Smith
Will be appling a hydrolic mulch with seed on 2/11/2011. Will reinspect on 2/11/11 for verify the application.
General Inspection ESC12/7/201012/7/201012/7/2010 DONE
DetailsClint A Smith
No activity.
General Inspection ESC10/5/201010/5/201010/5/2010 CANC
DetailsClint A Smith
General Inspection ESC10/4/201010/4/201010/5/2010 PASS
DetailsClint A Smith
BMP Violation8/2/20108/4/20108/4/2010APASS
DetailsClint A Smith
General Inspection ESC8/2/20108/2/20108/2/2010 FAIL
DetailsClint A Smith
Verbal to RP:
Maintain concrete washout. And maintain both concrete exits off of the laydown area. Will re-inspect on 8/8/10am.
General Inspection ESC5/31/20105/31/20106/1/2010 CANC
DetailsSteven Webb
BMP Violation3/15/20103/19/20103/19/2010APASS
DetailsClint A Smith
BMP Violation3/15/20103/15/20103/15/2010PFAIL
DetailsClint A Smith
Message to RP:
Place all concrete wash into the concrete washout pit that has been provided. Will re-inspect on 3/19/10 AM
BMP Violation1/26/20102/1/20102/1/2010ADONE
DetailsClint A Smith
Vegitation will be used as a sediment barrier / firter to collect any run off into the storm catch basin.
General Inspection1/26/20101/26/20101/26/2010PFAIL
DetailsClint A Smith
Verbal to RP to protect the storm drain basin located behind the Rite Aid with some type of sediment barrier. will re-inspect on 2/1/10
BMP Violation1/7/20101/11/20101/11/2010APASS
DetailsClint A Smith
BMP Violation1/7/20101/7/20101/7/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Place all concrete washout residual into the washout pit that has been constructed. Explain to the contractor of what is required when doing concrete cleaning out. Will re-inspect on 1/11/10
Complaint Inspection1/7/20101/7/20101/7/2010PPASS
DetailsClint A Smith
Found that the equiptment that was staged in the parking lot to the east was Boise City Public works. It will be removed today. It was done to to the conditions of the staging area yesterday. Spoke to RP and told him that if the area was going to be utilized as a staging area in the future, that the ESC permit would need to be ammended to show the area. Also they would need to get an approval from the landowner for the use of the parking lot. Will contact the complaintee of the resolution.
Site Preparation12/25/200912/25/200912/28/2009 PASS
DetailsClint A Smith
INSP - Stop Work Order12/21/200912/21/200912/21/2009APASS
DetailsClint A Smith
Sign posted and all bmp's are inplace per industry standards.
Routing - Erosion and Sediment12/17/2009 12/18/2009 PASS
DetailsSteven Webb
received one binder SWPP plan; routed to ESC. ESC plan approved with attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  12/18/2009  
Permit Ready to Issue  12/18/2009 DONE
Telephone call  12/18/2009 DONE
called left message with Kevin permit ready and fee given 12-18-09 dld
Issue & PRINT permit COM  12/18/2009 DONE
Routing - Erosion and Sediment12/15/2009 12/17/2009 PASS
DetailsSteven Webb
ESC plan waiver approved according to the attached conditions.
PLANS/APPL TAKEN TO FRONT DESK  12/17/2009  
Telephone call  12/17/2009 DONE
talked to josh young permit ready fees given
Permit Ready to Issue  12/17/2009 DONE
Application received  12/15/2009