Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC09-00793
StatusFinaled
Name RUSTIN RAY
Site Address 2082 S STONYFIELD PL
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/14/20106/14/20106/14/2010PPASS
DetailsMike Jordan
DOC - Permit Finaled6/14/20106/14/20106/14/2010PPASS
DetailsMike Jordan
Final stabalization is now completed.
Site Final2/24/20102/24/20102/24/2010PFAIL
DetailsMike Jordan
Needs to remove drain inlet protection. Final stabalization not completed.
Random Inspection2/2/20102/2/20102/2/2010PFAIL
DetailsDoug A Poedy
Mud in gutters, Debri and trash everywhere. BCC 8-17-02.4p BCC 8-17-02.4j,e
BMP Violation1/27/20101/27/20101/27/2010PPASS
DetailsMike Jordan
All issues have been resolved.
Site Preparation1/26/20101/27/20101/27/2010ACANC
DetailsMike Jordan
Rustin Phone #: ###-####
Site Preparation1/26/20101/26/20101/26/2010PFAIL
DetailsClint A Smith
Per the issues pertaining with the correction notice given by #450. Verbally spoke to RP via phone call over the violations that still need to be corrected:
1. Maintain the storm drain inlet protect since has exceeded 50% compacity.
2. Install and / or replace the sediment barrier per Boise City Erosion Control Field Manual.
3. Place all trash debris that is on the project area into the container that has been provided.
Photos taken of the violations that still are present.
Once complete, call to request an inspection to lift the soft hold.
Override - Parcel Holds1/26/20101/1/19001/26/2010  
for esc inspection only
Override - Parcel Holds1/26/20101/1/19001/26/2010  
this is for esc only
General Inspection1/25/20101/25/20101/25/2010PFAIL
DetailsMike Jordan
Remove silts from hard surfaces, Clean all const. debries, replace di proctection and repair silt fence to industry standards. c/n posted. Stop work also issued.
General Inspection1/22/20101/22/20101/22/2010PPASS
DetailsBob Reichert
looked ok
Random Inspection1/11/20101/11/20101/11/2010APASS
DetailsMike Jordan
ESC permit sign in place. All BMP's in place. Site was clean. Placement of conc flatwork taking place at time of insp. Concrete trucks using washout, no trackout noted at this time.
General Inspection1/7/20101/7/20101/7/2010PDONE
DetailsClint A Smith
Explained to the concrete contractor and the concrete company (idaho concrete) that the clean of the shoots need to be completed into the concrete washout pit that has been provided
Tracking Control1/7/20101/7/20101/7/2010PPASS
DetailsClint A Smith
Tracking Control1/4/20101/5/20101/5/2010APART
DetailsClint A Smith
Message to RP:
Parlially cleaned up the track at the south west end back of lot. Not to satifactory of what the city expects. Also high amount of foot traffic of of lots. Told the RP that the city expect if you choose to work within such weather conditions that you must clean up and maintain all issues that have occured on a daily basis or once has been completed for the day. Failure to comply with the expectations will result in a stop work order. Will re-inspect on 1/6/09 AM.
Tracking Control1/4/20101/4/20101/4/2010AFAIL
DetailsClint A Smith
Message to RP:
Clean up tracking onto hard surfaces at the South west end of lot. Will re-inspect on 1/5/09AM.
INSP - Stop Work Order1/4/20101/4/20101/4/2010APART
DetailsClint A Smith
All issues from the stop work order have been corrected. Stop work order lifted.
INSP - Stop Work Order12/31/200912/31/200912/31/2009PFAIL
DetailsClint A Smith
Message to Stetson Homes Rep (Shelly) and contractor Hard Rock (Dave):
Stop work order still in place.
Re-install sediment barrier per industry standards. Once complete call in for a re-inspection.
BMP Violation12/29/200912/30/200912/30/2009PFAIL
DetailsClint A Smith
Refer to the Stop Work Order inspection.
INSP - Stop Work Order12/30/200912/30/200912/30/2009PFAIL
DetailsClint A Smith
STOP WORK ORDER ISSUED
Message to RP:
Stop work order issued due to the pervious correction notice stating the violation that have occued with the corrective actions needed. Nothing has been address to what the city expects. Once all issues have been corrected. An inspection must be schuded to have have the stop work order lifted.
Site Preparation12/29/200912/29/200912/29/2009 CANC
DetailsClint A Smith
BMP Violation12/28/200912/29/200912/29/2009PFAIL
DetailsClint A Smith
Correction Notice: (Message to RP)
1. Install adiquate sediment barriers along the perimeter of project back of sidewalk.
2. Post ESC fully visable from the street.
3. Clean up all sediment and debris off of all hard surfaces. Will re-inspect on 12/30/09.
Failure to comply will result in a Stop Work Order.
Site Preparation12/24/200912/24/200912/28/2009PFAIL
DetailsClint A Smith
Verbal to RP via message to cell phone:
1. Install a sediment barrier along the perimeter of the front of lot a the court side.
2. Clean up all sediment and debris off of all hard surfaces.
Will re-inspect on 12/29/09 PM.
Site Preparation12/23/200912/23/200912/23/2009PPART
DetailsMike Jordan
ESC permit sign posted. Conc washout pit ok. Needs to provide waddels around excavated soils at sidewalk and along property line.
Issue & PRINT permit SFD  12/22/2009 DONE
Application received  12/15/2009