Permit Information
Permit NumberESC09-00808
StatusFinaled
Name MIKE L SMITH
Site Address 724 S HEMINGWAY AVE
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/15/20103/15/20103/15/2010PPASS
DetailsJim Sly
DOC - Permit Finaled3/15/20103/15/20103/15/2010PPASS
DetailsJim Sly
Random Inspection3/12/20103/12/20103/12/2010APASS
DetailsJim Johnson
Random Inspection2/5/20102/5/20102/5/2010PPART
DetailsJim Sly
This particular lot appears OK....IE.. not a lot of trash, Graded close to 2%, currently sweeping all hard surfaces, sign posted. Appears to have cleaned out existing D/I filter (closest to lot) and replaced.
General Inspection2/5/20102/5/20102/5/2010PPART
DetailsSteven Webb
Met with RP, project foreman, ESC inspector (460). Reviewed permit general plan conditions. Overall site is in good shape, needs to control sub-contractors activities to achieve permit compliance. With high moisture conditions on bare soils parking of trailers and access to home sites should be limited to hard surfaces or track-out compliance will never to reached. Reviewed federal requirements as well, including the need to have a SWPPP and filing of the NOI. Daily sweeping and general cleanup of the site will be needed and entire site mechanical sweeping with a on call agreement will be needed. All parties were in agreement.
BMP Violation2/4/20102/5/20102/5/2010APART
DetailsClint A Smith
Waiting on street sweeping to occur. Will be having confrence at 11am today with the RP and the Erosion Control Manager for the city of boise.
BMP Violation2/2/20102/4/20102/4/2010PFAIL
DetailsClint A Smith
Verbal notification form issues of the correction notice that was issued on 2/01/10.
Final Notice pertaining to the sub-division. RP is the the RP for all project lot throughout the Sub-Division.

Clean all hard surfaces (street, sidewalks, gutterpans and driveways) through out the sub division. This needs to occur on a daily basis of what has generated from the foot traffic of work that is being complete. Will re-inspect on 2/5/10 AM. FAILURE TO COMPLY, WILL RESULT IN A STOP WORK ORDER ON ALL ACTIVE PROJECT WITHIN THE SUB DIVISION (Riven Dell Subdivision.)
BMP Violation2/1/20102/2/20102/2/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Continue the sweeping of the hardsurfaces throughout the project area. Also place all trash debris into the containers that are provided.

Also show and discussed with the RP ovver the federal requirements of the CGP and how that have disturbed over an acre and how they are in a "part of a larger commen plan of developement or sale". Explained to him over how achieve compliance per the Federal Requirements.

Will re-inspect on 2/4/10 PM.
Complaint Inspection2/1/20102/1/20102/1/2010AFAIL
DetailsClint A Smith
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces through out sub division.
2. Maintain and inspect storm drain inlet protecion through out the sub division.
3. Place all trash debris into the provided trash container through out the subdivision.
4. Remove or install all BMP's per industry standards.
Failure to comply will result in a stop work order. Will re-inspect on 2/2/10 PM.
Site Preparation1/19/20101/19/20101/19/2010 CANC
DetailsClint A Smith
completed by inspector 316.
Site Preparation1/15/20101/15/20101/15/2010PPASS
DetailsJim Sly
Mike phone
Issue & PRINT permit SFD  1/12/2010 DONE
Application received  12/23/2009