Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00004
StatusFinaled
Name JIM SHERVIK
Site Address 2178 E SOLITUDE CT
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/22/201012/22/201012/22/2010 DONE
DetailsClint A Smith
Work is complete and site is stabilized. Permit finalled.
DOC - Permit Finaled12/22/201012/22/201012/22/2010PPASS
DetailsClint A Smith
Site Final10/1/201010/1/201010/1/2010PNR
DetailsDave Hannah
needs to land scape
Site Final9/28/20109/28/20109/28/2010ACANC
DetailsClint A Smith
Site is not ready to final. Landscaping must be completed.
Random Inspection9/27/20109/27/20109/27/2010PPASS
DetailsClint A Smith
Random Inspection6/22/20106/22/20106/22/2010PPASS
DetailsDave Hannah
Random Inspection6/17/20106/17/20106/17/2010APASS
DetailsDave Hannah
General Inspection6/14/20106/14/20106/14/2010APART
DetailsSteven Webb
Verbal to RP; post new sign, pick up general trash.
Random Inspection5/24/20105/24/20105/24/2010APASS
DetailsDave Hannah
Random Inspection5/4/20105/4/20105/4/2010APASS
DetailsClint A Smith
Random Inspection4/13/20104/13/20104/13/2010PPASS
DetailsDave Hannah
Random Inspection4/8/20104/8/20104/8/2010APASS
DetailsDave Hannah
Random Inspection3/29/20103/29/20103/29/2010PPASS
DetailsSteven Webb
Sign is posted, washout being used, drop inlets protected, hard surfaces clean & sediment barriers in place on the downslopes.
Random Inspection3/26/20103/26/20103/26/2010APART
DetailsDave Hannah
site looks good
Random Inspection3/9/20103/9/20103/9/2010PPASS
DetailsMike Jordan
BMP Violation2/26/20103/2/20103/2/2010APASS
DetailsClint A Smith
General Inspection3/2/20103/2/20103/2/2010PPASS
DetailsDave Hannah
BMP Violation2/25/20102/26/20102/26/2010APART
DetailsClint A Smith
Verbal to IRP:
Concrete wash was taken off of the sidewalk but still need to place the rest into the pit that was constructed. Will follow up on 3/2/10 AM.
Random Inspection2/24/20102/24/20102/25/2010PFAIL
DetailsClint A Smith
Verbal to RP:
CLeqan up all concrete was that is outside of the washout pit. Will re-inspect on 2/26/10AM.
General Inspection1/29/20102/1/20102/1/2010APASS
DetailsClint A Smith
Site looks good. All stock pile have been covered with 10+ mill plastic.
Site Preparation1/21/20101/26/20101/26/2010ADONE
DetailsClint A Smith
No activity today due to weather conditions.
Site Preparation1/21/20101/21/20101/21/2010 CANC
DetailsClint A Smith
Moved to a confrence.
Conference1/21/20101/21/20101/21/2010PDONE
DetailsClint A Smith
Went over the conditions of the project w/ the RP and also the developer.
City is requiring that all BMP's must be installed per the approved ESC plan that was submitted to the city. Also must schedule and pass a "Site Preperation" inspection of site and allBMP's prior to the start of all land disturbing activities. Failure to comply with this additional condition, a Stop Work Order will be issued. Will re-inspect once a inspection is scheduled and/or on 1/26/10am.
Issue & PRINT permit SFD  1/14/2010 DONE
Routing - Erosion and Sediment1/6/2010 1/6/2010 PASS
DetailsSteven Webb
ESC plan is approved with attached conditions.
Application received  1/5/2010