Permit Information
Permit NumberESC10-00008
StatusExpired
Name LARRY CURRY
Site Address 445 W MCGREGOR CT
Project Name 
Customer Number 
ePlanReview 
Description
WAIVER REQUEST: Cell tower
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired5/25/20115/25/20115/25/2011PDONE
DetailsSteven Webb
General Inspection5/9/20115/9/20115/10/2011 NR
DetailsSteven Webb
DOC - Permit Expired5/10/20115/10/20115/10/2011PDONE
DetailsSteven Webb
Project was never started.
General Inspection3/22/20113/22/20113/22/2011 PASS
DetailsClint A Smith
General Inspection2/4/20112/4/20112/4/2011 PASS
DetailsClint A Smith
Site Preparation12/20/201012/20/201012/20/2010PNR
DetailsSteven Webb
No signs of starting the project.
General Inspection9/27/20109/27/20109/27/2010PPART
DetailsJim Storey
Talked to contractor, CUP paperwork was submitted to Boise City on 8/29.
Site Preparation9/2/20109/2/20109/2/2010PNR
DetailsSteven Webb
Talked to contractor, CUP paperwork was submitted to Boise City on 8/29. Based on approval for construction of tower and building then building permit paperwork will be submitted. ESC may be extended so this disturbance can be covered for the construction. Applicant to complete the RP certification class and become certified prior to start of work.
Random Inspection7/8/20107/8/20107/8/2010PNR
DetailsSteven Webb
No signs of work.
Site Preparation5/25/20106/17/20106/17/2010ADONE
DetailsClint A Smith
No activity.
General Inspection5/25/20105/25/20105/25/2010PPASS
DetailsSteven Webb
Pad area has been filled in??? Sign is posted but no other work is being performed. Will follow up at a later date.
Site Preparation5/14/20105/24/20105/24/2010PPASS
DetailsClint A Smith
BMP Violation5/18/20105/19/20105/19/2010PPASS
DetailsClint A Smith
Site Preparation5/18/20105/19/20105/19/2010APASS
DetailsClint A Smith
Refer to history.
Site Preparation5/18/20105/18/20105/18/2010PFAIL
DetailsSteven Webb
Track out onto hard surfaces, no washout pit, sign not posted, IRP in Washington State. Contractors not from the area. Informed RP compliance is expected. Will follow up.
Complaint Inspection5/18/20105/18/20105/18/2010PFAIL
DetailsClint A Smith
Message to RP:
Must prodive all of the following corrective actions:
1. Post ESC sign where visable from the street.
2. Provide a washout for alll non storm water pollutants. No V.O.C's
3. Clean up all tracking off of the hard surfaces. Will re-insepct 5/19/10 PM.
Site Preparation5/7/20105/14/20105/14/2010PNR
DetailsSteven Webb
No field work started, but project sign has been posted. Will follow up next week.
Site Preparation4/30/20105/7/20105/7/2010PNR
DetailsSteven Webb
No sign of start up on the project, will re-inspect in a week.
Site Preparation4/20/20104/30/20104/30/2010PNR
DetailsSteven Webb
Work has not started. Will re-inspect in one week.
Site Preparation4/14/20104/20/20104/20/2010PNR
DetailsSteven Webb
No work has been observed, will follow up;
Site Preparation4/7/20104/14/20104/14/2010ANR
DetailsSteven Webb
Work has not started, will re-inspect on 4/20/10
Site Preparation4/1/20104/7/20104/7/2010ANR
DetailsClint A Smith
Site Preparation4/1/20104/1/20104/1/2010 NR
DetailsSteven Webb
Left message for RP for project status. Re-assigned site prep. inspection for inspector 460 on April 7th.
Issue & PRINT permit COM  3/25/2010 DONE
DetailsBarbara Stitt
Telephone call  1/11/2010  
called Michael T
Telephone call  1/11/2010  
called Michael Totten permit ready and fee given Also need RP 1-11-10 ///dld
Permit Ready to Issue  1/11/2010 DONE
Application received  1/8/2010  
Routing - Erosion and Sediment1/8/2010 1/8/2010 PASS
DetailsSteven Webb
ESC plan waiver request is approved with attached conditions. Need RP prior to issuance.
PLANS/APPL TAKEN TO FRONT DESK  1/8/2010